108 St Georges Terrace
Services: Installation, Engineering
Client: BHP
Cost: $2.5M
Location: Perth, WA
Services: Installation, Engineering
Client: BHP
Cost: $2.5M
Location: Perth, WA
The 108 St Georges Terrace project is a six-floor base build refurbishment and integrated fit-out at the Bank West tower in the Perth CBD.
The new fit-out features an integrated communications system allowing instantaneous, around the clock communication with their offices throughout the world.
The construction program was short, spanning 11 weeks, where Fredon delivered the architectural lighting, power and communications installation.