Allianz Stadium HV Maintenance

Services: Planned & Reactive Maintenance

Client: Venues, NSW

Location: Moore Park, NSW

Drawing on the team’s experience gained during the construction of Allianz Stadium, Fredon has continued to deliver high-voltage (HV) maintenance and operation support across areas of the venue’s electrical infrastructure.

The scope of assets includes a 750kVA dry-type transformer, ring main unit (RMU), substation battery and charger system, a 9-panel HV main switchboard, and a 4-panel generator switchboard, along with two 1250kVA kiosk substations and two 2000kVA substation transformers.

Fredon also maintains the site’s SCADA system for HV monitoring and control, including automated switching operations for Ausgrid supply failure and emergency generator backup functionality. This scope extends across all associated HV and LV power, fibre optic, and control cabling infrastructure.