Gunyama Park Aquatic and Recreation Centre
Services: Installation, Engineering
Client: CPB Contractors
Location: Zetland, NSW
Services: Installation, Engineering
Client: CPB Contractors
Location: Zetland, NSW
Gunyama Park Aquatic and Recreation Centre is a new urban pool complex, and it is one of the largest pools built in Sydney since the 2000 Olympics.
The recreational centre is located in Green Square and features a 50-metre heated outdoor pool and a unique beach-inspired leisure pool designed to mimic Sydney’s coastal pools. Indoor facilities include a 25-metre heated pool, leisure pool and a heated hydrotherapy pool. The centre also has a multipurpose sports field, gym with an outdoor yoga deck, cafe and creche facilities.
CPB Contractors engaged Fredon to design and supply the electrical, communications, security and audio visual works.
Works began in October 2018 and included the following:
Electrical and Communications:
Security:
Audio Visual:
The Aquatic and Recreation centre was open to the public in February 2021.